Temporary Road Closure Along Sengkang East Way for Construction of New Overhead Bridge

  • Published Date: 20 Jun 2019

              On 27 June 2019, a section of Sengkang East Way will be temporarily closed to traffic from 1.00am to 5.00am. The closed section of the road will be between the junction of Sengkang East Way and Sengkang East Road, to the junction of Sengkang East Way and Anchorvale Link.

     

    2          The closure is for the construction of a new pedestrian overhead bridge which is estimated to be completed by 3rd Quarter 2020. The new pedestrian overhead bridge will enable residents to conveniently cross Sengkang East Way and access the amenities in the vicinity.

     

    3          With the temporary road closure, motorists headed from Sengkang East Way to Sengkang West Way are advised to use the alternative route from Sengkang East Road to Anchorvale Street or from Sengkang East Road to Anchorvale Drive. Motorists travelling from Sengkang West Way to Sengkang East Way are advised to use the alternative route from Anchorvale Link to Anchorvale Street or from Anchorvale Link to Anchorvale Drive.

     

    4          Barricades and diversion signs will be put up to guide motorists. Motorists are advised to drive carefully and observe the information signs displayed. Please refer to the layout plan in the Annex for details on the temporary road closure and diversion routes.