• Published Date: 27 Jun 2018

                On 4 July 2018, a section of Punggol Way road will be temporarily closed to traffic from 1.00am to 5.00am.  The closure is for the construction of a new pedestrian overhead bridge that will enable residents to safely cross Punggol Way road and access the facilities and amenities in the vicinity. The closed section of the road will be between the junction of Punggol Way and Punggol Field roads, to the T-junction at Punggol Way leading to the Tampines Expressway (TPE).

     

    2          With the temporary road closure, motorists headed towards TPE or Sengkang East Road from Punggol Way or Punggol Field roads are advised to use the alternative route along Punggol Road towards TPE. Motorists headed towards Punggol Way or Punggol Field are advised to use the alternative route along TPE and Punggol Road.

     

    3          Barricades and diversion signs will be put up to guide motorists. Motorists are advised to drive carefully and observe the information signs displayed. Please refer to the layout plan in the Annex for details on the temporary road closure and diversion routes.

     

    4          The new pedestrian overhead bridge is expected to be completed by 4Q2018.