• Published Date: 07 Jul 2022

              A section of Bukit Batok West Ave 6 will be temporarily closed to traffic from 1.00am to 5.00am on 14 July 2022. The closed section of the road will be between the junction of Bukit Batok West Ave 9 and Bukit Batok West Ave 3.

     


    2        The temporary road closure is to facilitate the construction of a new pedestrian overhead bridge, which is estimated to be completed in end 2022. The new pedestrian overhead bridge will provide better connectivity for residents of the nearby public housing developments such as West Terra.

     


    3        With the temporary road closure, motorists are advised to use the alternative route along Bukit Batok West Ave 9, Ave 8 and Ave 3. For access to housing development West Terra (Blk 450, 450A-D, 451, 451A-C, 452 and 452A-C), motorists are advised to use the alternative entrance/exit near Blk 448A along Bukit Batok West Ave 3.

     


    4        Barricades and diversion signs will be put up to guide motorists. Motorists are advised to drive carefully and observe the information signs displayed. Please refer to the layout plan in the Annex for details on the temporary road closure and diversion routes.