Window Works

To avoid accidents from happening, do ensure that the installation or replacement of your flat’s windows is done safely and comply with HDB’s safety requirements. 

Installation or replacement of new aluminium windows

You must engage a Building and Construction Authority (BCA) approved window contractor registered with HDB for all window installation/ replacement work. These are the requirements that you need to comply with for window installations.

Aluminium casement windows

Download the illustration (PDF, 51KB) for reference.

Parts
Requirements
Friction stay
  • Stainless steel grade 304 or equivalent
  • Minimum thickness not less than 2.50mm
  • Length not less than 1/2 width of window leaf
Window leaf
  • Maximum width not exceeding 700mm
Aluminium section for screw connection
  • Minimum thickness 2.75mm
Connection of friction stay to window frame
  • Stainless steel grade 304 self-tapping screw of minimum size number 8 (4mm)
  • If aluminium section is not less than 3mm thick, epoxy coated screws can be used
  • Minimum 4 screws on each side of friction stay
Corner brackets 
(if used) for corners of window leaf
  • Zinc casting corner brackets

Aluminium sliding windows

Download the illustration (PDF, 92KB) for reference.

Parts
Requirements
Safety devices
  • To install the following:
  1. Polyethylene sliding window self-locking safety device (2 per panel)
  2. Synthetic resin stoppers at top of window outer frame
    • Minimum 2 stoppers per panel width and repeat the same along the track
    • The stopper shall be fastened with stainless steel grade 304 or equivalent rivet/ screw of minimum 4mm diameter
  3. Aluminium bottom outer frame with fixed angle facing outside
  • Dimension ‘b’ shall be minimum 1.50 times dimension ‘a’ (refer to illustration)
Sliding panel
  • Maximum width not exceeding 1.20m

Aluminium adjustable/ fixed louvre vent

Download the illustration (PDF, 25KB) for reference.

Parts
Requirements
Glass louvres
  • Minimum glass thickness not less than 6mm
  • Wire-glass type
Glass louvres safety device
  • Aluminium U-channel cleat at every glass louvre
 

Repair of existing aluminium windows

As a flat owner or occupant, you are responsible for the upkeep of the windows in your flat. Otherwise, a window could fall and cause serious injury or worse to those below.

Check out the safety requirements before you proceed with repairs for your existing aluminium windows.

Windows and grilles

Guidelines on other windows and grilles works.

Types of Building Work
Permit Required?
Subject to the Following Guidelines / Conditions
Placement of non-reflective film over the glass panel of existing windows/ balcony doors
No
  • Not applicable
Installation of bamboo chicks/ venetian blinds/ curtain rail internally
No
Installation/ replacement of window on parapet

Note
This is not applicable for balconies of DBSS flats and for flats handed over from 1 July 2007, where open balcony and/ or pure planter box are provided. For such flats, windows, full height sliding doors/ glass panels are not allowed to be installed at the balcony and/ or pure planter box.
Yes

Width of window panel:

  • Casement window: 500mm to 700mm
  • Sliding window: 500mm to 1200mm
  • To comply with the safety requirements for installation/ replacement of windows

For flats handed over from 1 July 2007 onwards:

  • Windows installed/ replaced must be of a similar colour scheme, proportion and type (i.e. sliding to sliding, casement to casement) as that of the original windows provided by HDB
  • For service yard, the windows installed/ replaced only need to be of a similar colour scheme as that of the original windows provided by HDB
Installation/ replacement of grilles at service yard/ balcony parapet (if any)
Yes

For flats handed over from 1 July 2007 onwards:

  • Grilles installed must be of HDB approved designs
  • Refer to the renovation factsheet given during the booking of flat/ collection of keys for the approved designs (sample renovation fact sheet) (PDF, 201KB)
  • You can view the specific renovation guidelines including approved grille designs for your flat (e.g. for service yard/ open balcony) by logging on to My HDBPage
Installation/ replacement of internal metal grilles of any design at window and balcony parapet
No

Applicable to developments handed over before 1 July 2007:

  • Metal grilles must be fixed internally and cannot protrude from the building facade
Installation of internal metal grilles of any design at double-storey balcony of executive maisonette
No
Installation of metal grilles at double-storey corridor end balcony of executive maisonette
No
Installation of metal grilles of any design at interaction balcony
No
  • Height of metal grilles must not exceed height of unit
  • Do not store any combustible material at the balcony area
Replacement/ removal of mild steel/ stainless steel railing on top of balcony parapet wall
No
  • This is applicable only to mild steel/ stainless steel railing on top of reinforced concrete parapet
  • The height of the balcony parapet wall from finished floor level must be at least 1000mm
  • Apply 2 coats of rust inhibitor to the surface of exposed steel bars (where the steel bars are anchored into) before any finishing work is done to prevent rusting
 

Replacement of full height windows (including 3/4 height and bay windows)

The replacement of full height windows is strictly not allowed. Permission may be granted in an instance where a damaged frame requires a complete replacement.

See examples of full height windows (including 3/4 height and bay windows) (PDF, 324KB).

A Qualified Person (QP) must be engaged to certify the lateral loading in such replacement works. Building Control Regulations require that your engaged QP must submit structural calculations and drawings to BCA for regulatory approval through the Construction and Real Estate Network (CORENET).

Upon receiving BCA’s approval, your BCA approved window contractor can submit BCA’s ‘Permit to Commence Structural Work’ along with the approved drawings to HDB to obtain a renovation permit. Once the permit is issued replacement work can begin.

The replacement will have to comply with HDB’s original windows:

  • Colour scheme
  • Dimension
  • Window type (i.e. casement to casement, sliding to sliding)